North Vancouver, B.C., February 14, 2017. Lion One Metals Limited (TSX-V: LIO) (ASX: LLO) (OTCQX: LOMLF) (FSX: LY1) (the “Company”) is pleased to announce further results from its ongoing drilling program at its 100% owned and fully permitted Tuvatu Gold Project located near Nadi on the island of Viti Levu in the Republic of Fiji.
The Company has received results for the first diamond drill hole completed in its 2017 drill program, focused on infilling and extending mineralized lodes targeted for the first two years of planned development and production at Tuvatu. TUDDH 419 targeted a series of relatively flat lying “SKL” lodes from 71.36 to 103.64 meters, and also intersected a near surface, high grade interval of 13.52 g/t gold over 9.07 meters from 32.83 to 41.90 meters. Further drilling is planned to follow up these intersections.
“These results confirm the high grades of the lodes targeted for development and highlight the potential for wider zones of mineralization” said Lion One Managing Director Stephen Mann.
Today’s results complement the results reported on Nov. 23 and Dec. 21, 2016 which included:
- 8.41m @ 71.41 g/t Au from TUDDH 406
- 4.05m @ 12.32 g/t Au from TUDDH 407
- 2.55m @ 13.95 g/t Au from TUDDH 408
- 3.92m @ 12.54 g/t Au from TUDDH 409
- 2.42m @ 24.07 g/t Au from TUDDH 410
- 1.39m @ 16.06 g/t Au from TUDDH 412
Highlights of TUDDH 419 are summarized as follows:
Tuvatu Drilling Results February 2017
HOLE ID | N | E | RL | AZIMUTH | DIP | DEPTH M |
---|---|---|---|---|---|---|
TUDDH 419 | 3920833.94 | 1876473.97 | 240 | 180 | 85 | 125.9 |
FROM (M) | TO (M) | INTERVAL (M) | GRADE (G/T AU) |
---|---|---|---|
32.83 | 41.90 | 9.07* | 13.52 |
includes | 5.57 | 21.04 | |
71.36 | 72.80 | 1.44 | 19.65 |
83.66 | 85.70 | 2.12 | 14.28 |
101.49 | 103.64 | 2.15 | 3.65 |
*True widths of the drill hole intersection have not been determined from the information available
Dewatering
The Company recommenced dewatering of the existing exploration decline in early January, and is refurbishing the decline as dewatering progresses. Except for the limited slippage in the Core Shed Fault zone 140m from the decline entrance, ground conditions in the decline are generally very good. Drill cuddies have been prepared and ventilation fans have been installed in preparation for further diamond drilling from underground to complement the drilling from the surface.
Geotechnical Drilling
A number of geotechnical diamond drill holes were completed during January 2017 in the area of the proposed new portal planned as the main access into the gold deposits at Tuvatu. Ground conditions appeared to be very good. Further evaluation of results of the geotechnical holes will be undertaken.
Quality Control (QAQC)
Samples for the 2017 drill program are marked, logged, and cut with a diamond saw onsite, placed in sealed bags sent to the Company’s Nadi office. Samples are shipped to Brisbane Qld for customs clearance, then Townsville Qld for sample preparation and multi-element ICP analysis. A Quality Control/Quality Assurance program, including the insertion of Standards and Blanks, has been implemented. The 2017 exploration program is performed under the supervision of Stephen Mann, P.Geo, Managing Director of Lion One Metals, and a ‘Competent Person’ under JORC. Mr. Mann has reviewed and approved the technical content of this release. Albert Siega, P. Eng., a full time employee of the Company and Qualified Person as defined by NI 43-101 has reviewed and approved the technical content of this release. The Company is not basing its production decision on a feasibility study of mineral reserves demonstrating economic and technical viability; as a result there is increased uncertainty and economic and technical risks associated with its production decision.
About Tuvatu
The Tuvatu Gold Project is located 17 km from the Nadi International Airport on the main island of Viti Levu in Fiji. Discovered in 1987, Tuvatu was advanced by previous owners through underground exploration and development from 1997 through to the completion of a feasibility study in 2000. Acquired by Lion One in 2011, the project has over 100,000 meters of drilling completed to date in addition to 1,600 meters of underground development. Tuvatu is a high grade, low sulphidation, epithermal gold deposit hosted inside a South Pacific-style volcanic caldera, along the Viti Levu lineament, Fiji’s own corridor of high grade gold deposits. In January 2016 the Hon. Prime Minister of Fiji, Mr. V. Bainimarama, formally presented the previously granted Tuvatu Mining Lease to Lion One, concluding the permitting process for the development of an underground gold mine and processing plant at Tuvatu, demonstrating strong government support for Fiji’s 85 year-old gold mining industry.
As per its independent June 1, 2015 NI 43-101 PEA Technical Report on the Tuvatu Gold Project, the Company envisages a low cost underground gold mining operation producing 352,931 ounces of gold at head grades of 11.30 g/t Au over an initial 7 year mine life, including 262,000 ounces at 15.30 g/t through year three, at cash costs of US$567 per ounce with all-in sustaining costs of US$779 per ounce. Total capex of US$48.6 million includes a contingency of US$6.1 million with an 18 month preproduction schedule and 18 month payback on capital. At a US$1,200 gold price the project generates net cash flow of US$112.66 million and an IRR of 52% (after tax). Tuvatu is situated upon a 5 hectare footprint inside a larger 384 hectare mining lease that contains numerous high grade prospects proximal to Tuvatu, at depth, and up to 1.50 km along strike from the resource area, giving the project near-term production potential and further discovery upside inside of one of Fiji’s underexplored volcanic goldfields.
The information in this report that relates to the Exploration Results or Mineral Resources is based upon, and fairly represents, information and supporting documentation compiled by Mr. Stephen Mann, who is an officer and director of the Company and is a member of The Australasian Institute of Mining and Metallurgy. Mr. Mann has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and the activity in which he is undertaking to qualify as a Competent Person under 2012 Edition of the Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr. Mann consents to the inclusion in this news release of the matters based on his information in the form and context in which it appears. The Company confirms that it is not aware of any new information or data that materially affects the information included in previous news releases referred to above, and confirms that the form and context in which the findings are presented have not been materially modified from the original news releases. Albert Siega, P. Eng., a full time employee of the Company and Qualified Person as defined by NI 43-101 has reviewed and approved the technical content of this release.
For more information on Lion One including technical reports please visit the Company’s website at www.liononemetals.com or the SEDAR website at www.sedar.com.
On behalf of Lion One Metals Limited
“Walter H. Berukoff”
Chief Executive Officer
For further information please contact
Stephen Mann, Managing Director (Perth, Australia) Tel: 604-973-3007
Hamish Greig, Vice President (North Vancouver, BC) Tel: 604-973-3008
Joe Gray, Investor Relations (North Vancouver, BC) Tel: 604-973-3004
Toll Free IR Line (North America) Tel: 1-855-805-1250
Email: info@liononemetals.com
Neither the TSX Venture Exchange nor its Regulation Service Provider accepts responsibility for the adequacy or accuracy of this release. This press release may contain “forward-looking information” within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein are forward looking information. Generally, forward-looking information may be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “proposed”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases, or by the use of words or phrases which state that certain actions, events or results may, could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals Limited’s current beliefs and is based on information currently available to Lion One Metals Limited and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include, but are not limited to, the actual results of exploration projects being equivalent to or better than estimated results in technical reports, assessment reports, and other geological reports or prior exploration results. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the early stage development of Lion One Metals Limited, general business, economic, competitive, political and social uncertainties; the actual results of current research and development or operational activities; competition; uncertainty as to patent applications and intellectual property rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting mining, timing and availability of external financing on acceptable terms; not realizing on the potential benefits of technology; conclusions of economic evaluations; and lack of qualified, skilled labor or loss of key individuals. Although Lion One Metals Limited has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake to update any forward-looking information, except in accordance with applicable securities laws.